中文题目:山东中烟卷烟感官质量提升项目进度控制研究 
英文题目:Research on the Schedule Control for the Optimization Project of Cigarette Sensory Quality promotion in Tobacco Shandong industrial Co., Ltd. 
指导老师:李季 
中文关键字:卷烟,感官质量,影响因素,项目进度控制 
英文关键字:cigarette, sensory quality,influencing factor,project schedule control 
中文摘要:21世纪以来,中国烟草经历了“百牌号”、“两个10多个”、“532、461”、“双15”等系列调整,山东中烟制定了“公司3286、泰山品牌246”战略目标。卷烟产品质量,尤其是感官质量稳定是公司核心竞争力的重要保证。国内烟草行业通常采用“卷烟国标(GB5606-2005)”对感官质量进行评价。国外对食品方面的感官质量评价也开展了大量研究,引入模糊综合评价方式及智能算法。 “卷烟感官质量提升”项目对卷烟感官质量及其评价指标的独特性进行分析。整体质量通常包括2个方面:内在质量、外观质量。由于吸烟与健康的问题,因此还有特殊的“安全质量”。以影响项目进度控制的因素为切入点,从项目工期、项目团队成员时间、项目成果3个主要方面入手对影响进度的因素进行全面分析。项目工期对进度的影响因素主要包括3个方面,项目计划、意外事件及物资采购。项目团队成员时间对进度的影响因素主要包括2个方面,团队成员技术水平、项目团队成员之间的沟通效果。项目成果对进度影响因素包括2个方面,项目申报、项目成果鉴定。针对主要因素逐一制定管理控制对策, 搭建“技术研讨会、月例会、周例会、日例会”等多重平台,有效解决了计划沟通及执行问题, 重点对输入、重要节点、结果及进度4个方面对项目进行总体控制,确保了项目完成的整体效果。 “卷烟感官质量提升”项目子、分项目结构设计及进度控制管理模式,在山东中烟科研开发项目管理中属于首次创新。项目首次引入非评吸评价的概念,按照卷烟消费的一般消费行为过程,从市场角度和专业角度进行系统地分析研究,确定感官质量关键指标14项,并建立评价标准。项目成果在泰山(S)、(W)、(H)、(G)4个产品上得以应用并产生良好的社会经济效益,形成了一套以消费者需求为目标导向的产品研发模式,为泰山品牌发展奠定了基础。 
英文摘要:Since the 21st century, Chinese Tobacco experienced “the hundred grades brand "," two more than 10 "," 532、461 "," double 15 "and a series of adjustments. China Tobacco Shandong industrial Co., Ltd. formulated the "Company 3286" and "Tarzan brand 246 "strategic objectives. The product quality of Cigarette, especially the sensory quality stability is an important guarantee for the core competitiveness of the company. The domestic tobacco industry usually adopt the "Cigarette GB (GB5606-2005)" to evaluate sensory quality. A large number of research has been carried out on the sensory quality of food overseas. The evaluation methods of fuzzy comprehensive and intelligent algorithm are applied in it. " Cigarette sensory quality promotion" project on the sensory quality of cigarette and the uniqueness of the evaluation index for analysis. Overall quality is usually consists of 2 areas: quality, appearance, quality. Since the smoking and health problem, it also has a special "safety". Factors affecting project progress control points, time duration, project team members, project from the project outcome 3 main ways. Duration of the project factors affecting the overall project plan consists of 3 main aspects, the overall project planning, unexpected events, the impact of material supply. Time effect on the progress of project team members mainly consists of 2 areas, the skills of the team members, communication between project team members well. Affecting factors on the progress of the program consists of 2 areas. project, the identification of the program. For comprehensive analysis of the factors affecting the progress, set up "technical seminars, monthly meetings, weekly meetings, day regular meeting" multiple platforms, effectively solve the issues of plan communication and implement. Focus on input, an important node, results and progress four aspects to the project in overall control, ensure that the project completed the overall effect. The project " cigarette sensory quality promotion " has new project management pattern which includes sub-item structure and sub-key structure design and schedule control. It belongs to the first innovation of research and development project management in Tobacco Shandong industrial Co., Ltd. The project was the first to introduce the concept of the evaluation of suction evaluation, according to the general consumer behavior cigarette consumption process, from the market Angle and professional Angle to carry on the system analysis, determine 14 the sensory quality key indicators and items, and establish evaluation standard. Because of applying the project achievement on Tarzan Brands (S), (W), (H) and (G).the good social and economic benefits are produced. 